On CBS MoneyWatch: Don't do this: Dumb financial advice
BNET Business Network:
BNET
TechRepublic
ZDNet

June 17th, 2008

Graphing the triple constraints of IT failure

Posted by Michael Krigsman @ 2:50 pm

Categories: Project management, Project portfolio management

Tags: Information Technology, Project Management, Tools & Techniques, Strategy, It Operations, It service Management, Management, Michael Krigsman

Every project management trainee is (or should be) taught the triple constraints of time, scope, and cost. These constraints represent trade-offs; you can’t change one without affecting the other two. For example, increasing scope has a corresponding effect on both project time and cost.

In this classic diagram, changing one leg of the triangle affects the other two:

Project management triple constraints

The mysticMundane blog offers an unusual presentation of this fundamental set of project management relationships:

Triple constraints graph

Looking at this graph, I mentioned to project failures guru, Ed Yourdon, that it all seems so obvious. His comment:

It may be obvious, but as Voltaire (and Will Rogers) have said, “Common sense isn’t common”

If you’re managing a project, it’s imperative to understand the relationship between all sides of the triple constraint triangle. The seemingly obvious triple constraint laws are ignored every day, much to the chagrin of those responsible for the failed projects that result.

Michael KrigsmanMichael Krigsman is CEO of Asuret, Inc., a software and consulting company dedicated to reducing software implementation failures. Click here to discuss this post with him on Twitter. See his full profile and disclosure of his industry affiliations.

Email Michael Krigsman

Subscribe to IT Project Failures via Email alerts or RSS.

  • Talkback
  • Most Recent of 14 Talkback(s)
RE: Graphing the triple constraints of IT failure
No, sometimes there are "just win" scenarios whereby all four dimensions: quality, scope, schedule, and resource are all either improved or held constant. To believe that it is a trade off is to beli... (Read the rest)
Posted by: gusto664 Posted on: 05/12/09 You are currently: a Guest | | Terms of Use
Problem with triple constraints  Erik Engbrecht | 06/17/08
General trends are accurate  mkrigsman@...ZDNet Moderator | 06/17/08
I disagree  Erik Engbrecht | 06/18/08
This is not new  happyharry_z | 06/17/08
RE: Graphing the triple constraints of IT failure  power4things | 06/18/08
Absolutely right  mkrigsman@...ZDNet Moderator | 06/18/08
Wrong attitude  Erik Engbrecht | 06/18/08
RE: Graphing the triple constraints of IT failure  relo | 06/18/08
IT isn't construction  Erik Engbrecht | 06/18/08
RE: Graphing the triple constraints of IT failure  geek49203_z | 06/18/08
Trading Email A for Email B  bfilipiak@... | 06/18/08
Perfect example!  Erik Engbrecht | 06/18/08
RE: Graphing the triple constraints of IT failure  crossderry | 06/22/08
RE: Graphing the triple constraints of IT failure  gusto664 | 05/12/09

What do you think?

SponsoredWhite Papers, Webcasts, and Downloads

advertisement

Recent Entries

Premier Vendor Content Whitepapers, webcasts & resources from our Power Center Sponsors
advertisement

Archives

ZDNet Blogs

White Papers, Webcasts, and Downloads

Meet Doc

  • Here to help you with your Document Management Needs
  • Doc is an enigma. Born to a Russian ballerina and a German electrical engineer, he grew up in various locations in the United States. He’s seen the insides of more brands, versions, and generations of printer and printer-related hardware than almost anyone.
  • To learn more about this mysterious figure check out his blog on ZDNet and his Workspace on TechRepublic. You’ll be glad you did.
  • Produced by
    ZDNet and